See Our Work


Click on image below to see detailed summary and project sheet:

Recreation Pier Luxury Hotel, Street-view Rendering
Recreation Pier Luxury Hotel
Civil Engineering, Marine Engineering, Permitting, Structural Engineering
  • Owner:
    Sagamore Development Company
  • Total Construction Cost: $60 million
  • WBCM Services:
    Structural Engineering
    Marine Engineering
    Civil Engineering
    Surveying
    Permitting
WB&A Trail Pedestrian Bridge
WB&A Trail Pedestrian Bridges, Anne Arundel County Department of Public Works
Bridge Engineering, Civil Engineering
  • Owner:
    Anne Arundel County Department of Public Works
  • Total Construction Cost:
    $1.1 million
  • WBCM Services:
    Bridge Engineering
    Environmental Water Resources
    Site Engineering
Lot 304 Flood Mitigation
Civil Engineering, Marine Engineering
  • Owner: Maryland Port Administration
  • Size: 3.82 acres
  • Total Construction Cost: $4.12 million
  • WBCM Services: Marine Engineering
    Civil Engineering
    Environmental Water Resources
Potomac Hollow Road over Moores Run
Potomac Hollow Road over Moores Run Bridge Replacement
Bridge Engineering, Highway Engineering, Permitting, Traffic Engineering
  • Owner:
    Allegany County Department of Public Works
  • Total Construction Cost:
    $877,000
  • WBCM Services:
    Bridge Engineering
    Traffic Engineering
MD 200/US 1 Interchange
MD 200 – Intercounty Connector (ICC) Contract D/E
Bridge Engineering, Highway Engineering, Traffic Engineering
  • Owner:
    Maryland State Highway Administration
  • Total Construction Cost:
    $90 million
  • WBCM Services:
    Highway Engineering
    Bridge Engineering
    Traffic Engineering
    Environmental Water Resources
    Surveying
    Permitting
UMCES Chesapeake Biological Laboratory Pier Repairs
Chesapeake Biological Laboratory,
University of Maryland Center for Environmental Studies
Marine Engineering, Permitting, Surveying
  • Owner:
    Center for Environmental Science, University of Maryland
  • Total Construction Cost:
    $3.2 million
  • WBCM Services:
    Marine Engineering
    Surveying
    Permitting
Krimgold Park, Pond View
Krimgold Park
Civil Engineering, Landscape Architecture, Permitting, Surveying
  • Owner:
    Carroll County Recreation and Parks
  • Size:
    139 acres
  • Total Construction Cost:
    $2.5 million
  • WBCM Services:
    Civil Engineering
    Landscape Architecture
    Surveys
Maydale Conservation Park Stream Restoration
Maydale Conservation Park Stream Restoration
Civil Engineering
  • Owner:
    Maryland-National Capital Park and Planning Commission
  • Size:
    3,000 LF
  • Total Construction Cost:
    $1 million
  • WBCM Services:
    Civil Engineering
    Structural Engineering
    Utilities
    Surveying
    Permitting
    Landscape Architecture
    Public Outreach
Ridley Athletic Complex Stormwater Pumping Station
Stormwater Pumping Station and Water Quality Retrofit, Ridley Athletic Complex
Civil Engineering
  • Owner:
    Loyola University Maryland
  • Total Construction Cost:
    $1.1 million
  • WBCM Services:
    Site Engineering
    Sanitary Engineering
    Surveying
    Permitting
Enoch Pratt Free Library, Canton Branch
Enoch Pratt Free Library, Canton Branch Renovations
Architecture, Construction Services, Interior Design
  • Owner:
    City of Baltimore
  • Total Construction Cost:
    $2.6 million
  • WBCM Services:
    Architecture
    Interior Design
    Structural Engineering
    Construction Services
McClure Tennis Center at Ridley Athletic Complex
McClure Tennis Center at Ridley Athletic Complex
Civil Engineering, Landscape Architecture, Surveying
  • Owner:
    Loyola University Maryland
  • Total Construction Cost:
    $4 million
  • WBCM Services:
    Civil Engineering
    Survey
    Utilities
Maryland House Travel Plaza
Replacement of I-95 Travel Plazas, Maryland House and Chesapeake House
Civil Engineering, LEED/Sustainability, Traffic Engineering
  • Owner:
    AREAS USA INC
  • Size:
    27,000 SF (Maryland House)
    29,700 SF (Chesapeake House)
  • Total Construction Cost:
    $56 million
  • WBCM Services:
    Civil Engineering
    Traffic Engineering
    Surveying
    Utilities
    Permitting
One Maryland One Centerline
One Maryland One Centerline Initiative
Geospatial Innovations
  • Owner:
    Maryland State Highway Administration
  • WBCM Services:
    Geospatial Innovations
Frederick Ave Bridge Aerial View
Frederick Avenue Bridge over Gwynns Falls and CSX Railroad
Bridge Engineering, Permitting, Surveying, Traffic Engineering
  • Owner:
    City of Baltimore Department of Transportation
  • Total Construction Cost:
    $14.5 million
  • WBCM Services:
    Bridge Engineering
    Traffic Engineering
    Surveying
    Permitting
CSX B&O Coal Pier
B&O Coal Pier Improvements,
CSX Transportation
Marine Engineering
  • Owner:
    CSX Transportation
  • Total Construction Cost:
    $20 million
  • WBCM Services:
    Marine Engineering
    Structural Engineering
    Site Engineering
    Surveying
    Permitting
Rausch Road (SR 2001) over Kettle Creek
Rausch Road (SR 2001) over Kettle Creek Bridge Replacement
Bridge Engineering, Permitting, Traffic Engineering
  • Owner:
    PennDOT District 2.0
  • Total Construction Cost:
    $1.1 million
  • WBCM Services:
    Bridge Engineering
    Environmental Water Resources
    Traffic Engineering
    Highway Engineering
    Utilities
    Permitting
Navy Medical Biological Defense Research Laboratory
Navy Medical Biological Defense Research Laboratory, Fort Detrick
LEED/Sustainability, Structural Engineering
  • Owner:
    USACE, Baltimore District
  • Size:
    37,729 SF
  • Total Construction Cost:
    $21 million
  • WBCM Services:
    Site Engineering
    Structural Engineering
    Surveying
    Landscape Architecture
    LEED
    BIM
FCC Lubricants Used Oil Refinery
Used Oil Re-Refinery, FCC Lubricants
Industrial/Process Engineering, Permitting
  • Owner:
    FCC Lubricants, LLC
  • Size:
    9.671 acres
  • Total Construction Cost:
    $50 million
  • WBCM Services:
    Architecture
    Site Engineering
    Structural Engineering
    Industrial Engineering
    Surveying
    Permitting
612 West Hamilton Street
612 West Hamilton Street Renovations
Civil Engineering, Structural Engineering
  • Owner:
    Charles Street Capital, LLC
  • Total Construction Cost:
    $7 million
  • WBCM Services:
    Structural Engineering
    Civil Engineering
Boundary Gate at Nallin Pond
Boundary Gate at Nallin Pond, Fort Detrick
Civil Engineering, LEED/Sustainability, Structural Engineering
  • Owner:
    USACE, Baltimore District
  • Total Construction Cost:
    $10.2 million
  • WBCM Services:
    Site Engineering
    Structural Engineering
    Highway Engineering
    Landscape Architecture
    Surveying
    Permitting
Bowie State University Campus-wide Improvements
Bowie State University Campus-wide Improvements
Architecture, Civil Engineering, Landscape Architecture, Surveying
  • Owner:
    Bowie State University
  • Size:
    35,000 SF Plaza
    4,000 FT Campus Roadway
    298-acre Campus Survey
  • Total Construction Cost:
    $3.2 million
  • WBCM Services:
    Planning
    Landscape Architecture
    Civil Engineering
    Surveying
    Construction Administration
    Permitting
Baltimore Washington Medical Center
Baltimore Washington Medical Center Inpatient Tower and Women’s Center
Structural Engineering
  • Owner:
    Baltimore Washington Medical Center
  • Size:
    245,000 SF
  • Total Construction Cost:
    $76.5 million
  • WBCM Services:
    Structural Engineering
Tate Center Pedestrian Bridge
Tate Center Pedestrian Bridge, Baltimore Washington Medical Center
Structural Engineering
  • Owner:
    Baltimore Washington Medical Center
  • Total Construction Cost:
    $2.1 million
  • WBCM Services:
    Structural Engineering
Fort Detrick Emergency Services Center
Emergency Services Center, Fort Detrick
LEED/Sustainability, Structural Engineering
  • Owner:
    US Army Corps of Engineers, Baltimore District
  • Size:
    42,000 SF
  • Total Construction Cost:
    $13.4 million
  • WBCM Services:
    Civil Engineering
    Structural Engineering
    Surveying
    LEED
Crimea Mansion
Crimea Mansion
Architecture, Structural Engineering
  • Owner:
    City of Baltimore
  • Total Construction Cost:
    $1.1 million
  • WBCM Services:
    Architecture
    Structural Engineering
    Site Engineering
    Construction Management
Front Entrance, AAI Office Expansion
AAI Office Expansion
Architecture, Construction Services
  • Owner:
    AAI/Textron Corp
  • Size:
    172,000 SF
  • Total Construction Cost:
    $1.6 million
  • WBCM Services:
    Planning
    Architecture
    Construction Management
Pinnacle Health Patient Tower Addition
Patient Tower Addition, Pinnacle Health Community Campus
Structural Engineering
  • Owner:
    Pinnacle Health Hospitals
  • Size:
    69,000 SF
  • Total Construction Cost:
    $23 million
  • WBCM Services:
    Structural Engineering
The Engineers Club at the Garrett Jacobs Mansion
The Engineers Club at Garrett-Jacobs Mansion
Architecture, Construction Services, Interior Design, Structural Engineering
  • Owner:
    Engineering Society of Baltimore
  • Total Construction Cost:
    $10 million
  • WBCM Services:
    Architecture
    Interior Design
    Structural Engineering
    Site Engineering
    Surveying
    Permitting
Lundeberg School of Seamanship
Bulkhead, Revetment, Pier and Floating Dock Rehabilitation,
Lundeberg School of Seamanship
Marine Engineering
  • Owner:
    Harry Lundeberg School of Seamanship
  • Total Construction Cost:
    $5 million
  • WBCM Services:
    Marine Engineering
    Structural Engineering
    Surveying
    Construction Management
    Permitting
Mercedes Benz Vehicle Processing Center
Vehicle Processing Center, Mercedes-Benz USA
Architecture, Civil Engineering, Construction Services, Structural Engineering
  • Owner:
    Mercedes-Benz USA, LLC
  • Size:
    25,000 SF
  • Total Construction Cost:
    $2.5 million
  • WBCM Services:
    Architecture
    Site Engineering
    Structural Engineering
MD 200/US 29 Interchange
MD 200 – Intercounty Connector (ICC) Contract C
Bridge Engineering, Highway Engineering, Traffic Engineering
  • Owner:
    Maryland State Highway Administration
  • Size:
    18.8 miles
  • Total Construction Cost:
    $517 million
  • WBCM Services:
    Highway Engineering
    Bridge Engineering
    Traffic Engineering
    Environmental Water Resources
    Surveying
    Permitting
Waterfront III Office Building
Waterfront III Office Building
Structural Engineering
  • Size:
    69,730 SF
  • Total Construction Cost:
    $8 million
  • WBCM Services:
    Structural Engineering
Gulph Road (SR 1012) Bridge Replacement
Gulph Road (SR 1012) Bridge Replacement Over Trout Creek
Bridge Engineering, Environmental Water Resources
  • Owner:
    Penn DOT (District 8-0)
  • Total Construction Cost:
    $1.4 million
  • WBCM Services:
    Bridge Engineering
    Environmental Water Resources
    Highway Engineering
    Traffic Engineering
    Landscape Architecture
    Utilities
    Permitting
Goshen Branch Stream Restoration
Goshen Branch Stream Restoration
Environmental Water Resources
  • Owner:
    Maryland State Highway Administration
  • Total Construction Cost:
    $5 million
  • WBCM Services:
    Environmental Water Resources
    Traffic Engineering
Hess Oil Terminal Improvements and Rehabilitation
Terminal Improvements and Rehabilitation of North and South Docks,
Hess Oil
Marine Engineering
  • Owner:
    Hess Corporation
  • Total Construction Cost:
    $15 million
  • WBCM Services:
    Marine Engineering
    Structural Engineering
    Industrial Engineering
    Site Engineering
    Permitting
Lancaster Central Market
Lancaster Central Market Renovations
Structural Engineering
  • Owner:
    City of Lancaster
  • Size:
    20,540 SF
  • Total Construction Cost:
    $7 million
  • WBCM Services:
    Structural Engineering
    Historic Preservation
North Shore Townhomes
North Shore Townhomes at Canton
Civil Engineering, Marine Engineering
  • Owner:
    2301 Boston Street, LLC
  • Total Construction Cost:
    $30 million
  • WBCM Services:
    Marine Engineering
    Site Engineering
    Structural Engineering
    Surveying
    Permitting
Baltimore Grand Prix Pit Row
Baltimore Grand Prix Pit Row at Oriole Park at Camden Yards
Civil Engineering
  • Owner:
    Maryland Stadium Authority
  • Total Construction Cost:
    $2.5 million
  • WBCM Services:
    Site Engineering
    Structural Engineering
    Highway Engineering
    Environmental Water Resources
    Utility Engineering
    Landscape Architecture
    Surveying
    Graphic Design Services
State Street Bridge Rehabilitation
State Street (SR 4028) Bridge Rehabilitation
Bridge Engineering, Traffic Engineering
  • Owner:
    PennDOT (District 5-0)
  • Size:
    528 ft
  • Total Construction Cost:
    $6.5 million
  • WBCM Services:
    Bridge Engineering
    Traffic Engineering
    Highway Engineering
    Environmental Water Resources
    Utilities
    Permitting
USNA Metzger Hall
Metzger Hall, US Naval Academy
Architecture, Civil Engineering, LEED/Sustainability, Structural Engineering
  • Owner:
    US Naval Academy
  • Size:
    19,271 SF
  • Total Construction Cost:
    $6.4 million
  • WBCM Services:
    Architecture
    Site Engineering
    Structural Engineering
    Surveying
    LEED
Widening of Padonia Road from Beaver Dam Road to York Road
Widening of Padonia Road from Beaver Dam Road to York Road, Baltimore County Department of Public Works
Bridge Engineering, Highway Engineering
  • Owner:
    Baltimore County Department of Public Works
  • Total Construction Cost:
    $4.6 million
  • WBCM Services:
    Highway Engineering
    Bridge Engineering
    Traffic Engineering
    Environmental Water Resources
    Landscape Architecture
Phase 3 SAI Student Housing, California University of Pennsylvania
Phase 3 SAI Student Housing, California University of Pennsylvania
Structural Engineering
  • Owner:
    California University of Pennsylvania
  • Size:
    268,000 SF (Total Project)
    104,000 SF (Building A)
    68,000 SF (Building B)
    96,000 SF (Building C)
  • Total Construction Cost:
    $25 million
  • WBCM Services:
    Structural Engineering
Aleda E. Lutz VAMC Water Tower
Improvements to Water and Bulk Oxygen Storage Systems, Aleda E. Lutz Veterans Administration Medical Center
Architecture, Civil Engineering, Structural Engineering
  • Owner:
    Aleda E. Lutz Veterans Aministration Medical Center
  • Total Construction Cost:
    $3.5 million
  • WBCM Services:
    Architecture
    Site Engineering
    Structural Engineering
Lafarge Gypsum, Buchanan, NY
FGD (Synthetic Gypsum) Conversion, Lafarge-North America
Civil Engineering, Industrial/Process Engineering, Marine Engineering, Structural Engineering
  • Owner:
    Lafarge Gypsum – North America
  • Size:
    3,150 SF (Mill Addition)
    4,400 SF (Dock Improvements)
  • Total Construction Cost:
    $32.8 million
  • WBCM Services:
    Industrial/Process Engineering
    Marine Engineering
    Site Engineering
    Structural Engineering
    Permitting
Lockheed Martin Curie Court
Curie Court Office Building Renovation, Lockheed Martin Corporation
Architecture, Construction Services, Interior Design, LEED/Sustainability
  • Owner:
    Lockheed Martin Corporation
  • Size:
    100,000 SF
  • Total Construction Cost:
    $5 million
  • WBCM Services:
    Construction Management
    Architecture
    Interior Design
    Space Planning
    Site Engineering
    Structural Engineering
    Permitting
    LEED
Solid Waste Authoirty of Palm Beach County New Combined Residential & Commercial Materials Recycling Facility
New Combined Residential & Commercial Materials Recycling Facility,
Solid Waste Authority of Palm Beach County
Architecture, Industrial/Process Engineering, Structural Engineering
  • Owner:
    Solid Waste Authority of Palm Beach County, FL
  • Size:
    140,000 SF
  • Total Construction Cost:
    $41 million
  • WBCM Services:
    Architecture
    Structural Engineering
    Civil Engineering
    Industrial/Process Engineering
    Permitting
University of Maryland, Baltimore Campus Center
University of Maryland, Baltimore Campus Center
Civil Engineering, Structural Engineering
  • Owner:
    University of Maryland System
  • Size:
    155,500 SF
  • Total Construction Cost:
    $54 million
  • WBCM Services:
    Structural Engineering
    Civil Engineering
    Construction Administration
Hampstead Bypass Southern Roundabout
MD 30 Relocated (Hampstead Bypass)
Bridge Engineering, Environmental Water Resources, Highway Engineering, Traffic Engineering
  • Owner:
    Maryland State Highway Administration
  • Size:
    4.4 miles
  • Total Construction Cost:
    $43 million
  • WBCM Services:
    Highway Engineering
    Bridge Engineering
    Traffic Engineering
    Civil Engineering
    Utilities
    Environmental Water Resources
    Landscape Architecture
    Surveying
    Permitting
Picnic Area Renovations, Oriole Park at Camden Yards
Picnic Area Renovations, Oriole Park at Camden Yards
Civil Engineering, Landscape Architecture
  • Owner:
    Maryland Stadium Authority
  • Total Construction Cost:
    $200,000
  • WBCM Services:
    Site Engineering
    Landscape Architecture
Center for Leadership Excellence
Center for Leadership Excellence, Lockheed Martin Corporation
Architecture, Construction Services, Interior Design, LEED/Sustainability
  • Owner:
    Lockheed Martin Corporation
  • Size:
    335,000 SF
  • Total Construction Cost:
    $100 million
  • WBCM Services:
    Constructability Analysis
    Construction Consultation
    Owner Representative
    Interior Design
    Space Planning
    LEED
Interior of the Reisterstown Branch of the Enoch Pratt Free Library
Enoch Pratt Free Library, Reisterstown Branch Renovations
Architecture, Interior Design
  • Owner:
    City of Baltimore
  • Size:
    14,400 SF
  • Total Construction Cost:
    $1.3 million
  • WBCM Services:
    Architecture
    Interior Design
    Site Engineering
    Structural Engineering
    Surveying
    Emergency Response Services
USPS Headquarters
United States Postal Service Headquarters
Structural Engineering
  • Owner:
    United States Postal Service
  • Size:
    850,000 SF
  • Total Construction Cost:
    $5.8 million
  • WBCM Services:
    Structural Engineering
    Architecture
Ritz Carlton Waterfront Improvements
Waterfront Improvements, Ritz-Carlton Residences
Marine Engineering, Permitting
  • Owner:
    The Ritz-Carlton Residences
  • Size:
    1,300 LF
  • Total Construction Cost:
    $65 million
  • WBCM Services:
    Marine Engineering
    Structural Engineering
    Permitting
Rose Hill Park
Rose Hill and Pinecliff Parks, Frederick County Department of Public Works
Civil Engineering, Landscape Architecture, Surveying
  • Owner:
    Frederick County
  • Size:
    98 acres
  • Total Construction Cost:
    $2.2 million
  • WBCM Services:
    Site Engineering
    Architecture
    Landscape Architecture
    Surveying
CertainTeed Gypsum Rail Loading Facility
Synthetic Gypsum Rail Loading Facility
Civil Engineering, Construction Services, Industrial/Process Engineering, Structural Engineering
  • Owner:
    CertainTeed Gypsum, Inc.
  • Total Construction Cost:
    $4 million
  • WBCM Services:
    Industrial/Process Engineering
    Site Engineering
    Structural Engineering
    Permitting
    Construction Observation Services
Large Gypsum, Silver Grove, KY
Gypsum Wallboard and Joint Compound Manufacturing Plant,
Continental Building Products
Industrial/Process Engineering, Marine Engineering, Permitting, Structural Engineering
  • Owner:
    Lafarge North America (Continental Building Products)
  • Size:
    1,020,000 SF
  • Total Construction Cost:
    $225 million
  • WBCM Services:
    Architecture
    Marine Engineering
    Civil Engineering
    Structural Engineering
    Industrial/Process Engineering
    Surveying
    Permitting
Masonic Village Apartments
Masonic Village Apartments
Structural Engineering
  • Size:
    17,000 SF (per floor)
  • Total Construction Cost:
    $3.5 million
  • WBCM Services:
    Structural Engineering
Broad Creek Scout Reservation Renovations
Boy Scout Headquarters, Broad Creek Scout Reservation, Boy Scouts of America
Architecture
  • Owner:
    Boy Scouts of America
  • Size:
    5,900 SF (Total)
    1,200 SF (Activity & Training Center)
    4,700 SF (Pavilion)
  • Total Construction Cost:
    $870,000
  • WBCM Services:
    Architecture
    Structural Engineering
Calvert School Lower and Middle School Additions
Lower and Middle School Additions, Calvert School
Civil Engineering, Surveying
  • Owner:
    Calvert School
  • Size:
    1.8 acres
  • Total Construction Cost:
    $2.4 million (Middle School)
    $4.4 million (Lower School)
  • WBCM Services:
    Site Engineering
    Landscape Architecture
    Surveying
    Utilities
    Permitting
Leonardtown Wharf, St. Mary's, MD
Leonardtown Wharf, Commissioner of Leonardtown
Marine Engineering, Permitting
  • Owner:
    Commissioners of Leonardtown
  • Total Construction Cost:
    $3 million
  • WBCM Services:
    Site Engineering
    Structural Engineering
    Marine Engineering
    Permitting
Bare Hills Office Building
Bare Hills Office Center
Architecture, Interior Design, Structural Engineering
  • Owner:
    Capital Funding Group
  • Size:
    54,000 SF
  • Total Construction Cost:
    $9 million
  • WBCM Services:
    Architecture
    Interior Design
    Structural Engineering
    Civil Engineering
Westway Bulk Liquid Terminal
Bulk Liquid Storage Facility, Westway Bulk Liquid Terminal
Civil Engineering, Industrial/Process Engineering, Marine Engineering, Permitting
  • Owner:
    Westway Terminal Company, Inc.
  • Total Construction Cost:
    $60 million
  • WBCM Services:
    Industrial/Process Engineering
    Marine Engineering
    Site Engineering
    Surveying
    Permitting
Harborview Pier Townhomes
Harborview Pier Townhomes
Civil Engineering, Marine Engineering, Structural Engineering
  • Owner:
    HV Development & Contracting
  • Size:
    76,560 LF
  • Total Construction Cost:
    $50 million
  • WBCM Services:
    Marine Engineering
    Structural Engineering
    Site Engineering
    Surveying
    Permitting
Crossway Church
Crossway Church
Structural Engineering
  • Owner:
    Crossway Church
  • Size:
    30,000 SF
  • Total Construction Cost:
    $4 million
  • WBCM Services:
    Structural Engineering
Kurt Iron & Metal Brownfield Restoration
Kurt Iron & Metal Facility Brownfield Restoration, Maryland Port Administration
Marine Engineering, Permitting
  • Owner:
    Maryland Port Administration
  • Size:
    10.5 acres
  • Total Construction Cost:
    $8.5 million
  • WBCM Services:
    Marine Engineering
    Structural Engineering
    Site Engineering
    Permitting
    Construction Administration
Fairview Road (SR 0116) Bridge Replacement over Toms Creek
Fairview Road (SR 0116) Bridge Replacement Over Toms Creek
Bridge Engineering, Environmental Water Resources
  • Owner:
    Penn DOT (District 8-0)
  • Total Construction Cost:
    $1.8 million
  • WBCM Services:
    Bridge Engineering
    Environmental Water Resources
    Highway Engineering
    Traffic Engineering
    Landscape Architecture
    Utilities
    Permitting
Sagnor Ballroom, Beth Tfiloh Congregation
Sagner Ballroom & Facility Upgrades, Beth Tifiloh Congregation
Construction Services
  • Owner:
    Beth Tfiloh Congregation
  • Total Construction Cost:
    $1.1 million
  • WBCM Services:
    Construction Management
Bitumar Asphalt Unloading Pier Terminal
Asphalt Ship Terminal and Unloading Facility, Bitumar Asphalt
Marine Engineering
  • Owner:
    Bitumar Asphalt USA
  • Total Construction Cost:
    $1.5 million
  • WBCM Services:
    Marine Engineering
    Site Engineering
    Structural Engineering
    Surveying
    Permitting
Cedar Point Indoor Water Park
Castaway Bay Indoor Water Park, Cedar Point
Structural Engineering
  • Owner:
    Cedar Point
  • Total Construction Cost:
    $13 million
  • WBCM Services:
    Structural Engineering
Stormwater Management Retention Pond, MD 404
Stormwater Management Retention Pond along MD 404
Environmental Water Resources
  • Owner:
    Maryland State Highway Administration
  • Total Construction Cost:
    $460,000
  • WBCM Services:
    Environmental Water Resources
Baltimore World Trade Center
Flood Restoration, World Trade Center
Construction Services
  • Owner:
    Maryland Port Administration
  • Total Construction Cost:
    $7 million
  • WBCM Services:
    Construction Management, Inspection and Supervision
    Constructability Analysis
    Construction Consultation
    Owner Representative
Boy's Latin School Pedestrian Bridge
Boy’s Latin School Pedestrian Bridge
Bridge Engineering, Surveying
  • Owner:
    Boys’ Latin School
  • Total Construction Cost:
    $260,000
  • WBCM Services:
    Bridge Engineering
    Site Engineering
    Surveying
Louis A. Johnson VAMC
Louis A. Johnson Veterans Affairs Medical Center
Architecture, Civil Engineering, Structural Engineering
  • Owner:
    West Virginia Veterans Administration
  • Size:
    92,000 SF
  • Total Construction Cost:
    $22 million
  • WBCM Services:
    Architecture
    Interior Design
    Master Planning
    Space Planning
    Civil Engineering
    Structural Engineering
Altoona Pedestrian Bridge
Altoona Pedestrian Bridge
Bridge Engineering
  • Owner:
    City of Altoona
  • Total Construction Cost:
    $6 million
  • WBCM Services:
    Bridge Engineering
    Civil Engineering
    Landscape Architecture
    Utilities
    Permitting
    Railroad Coordination