WBCM provided construction management services for major upgrades to an existing terminal. The upgrades included a new deionized, reverse osmosis water treatment system, two storage tanks with dedicated high-accuracy blending pumps, a new air receiver with dryer for an existing compressed air system, and modifications to the existing truck load-out station to accommodate the new processes. Other modifications included the addition of a slop pump out system for the new secondary containment system and a 40-kilowatt tank immersion heater.

Client
Yara North America
Service(s) Provided
Construction Management, Marine Engineering, Civil Engineering, Permitting, Design
Location
Port Hueneme, FL

RELATED PROJECTS