WBCM provided construction management services for a new liquid fertilizer terminal on a previously developed industrial site. The new facility required 25,000 cubic yards of offsite-engineered fill to render the site usable. To prevent future contamination, 6,000 linear feet of double-walled, high density polyethylene containment pipe was installed, along with a centrally-monitored internal leak-detection system.

WBCM also oversaw the installation of new asphalt paving, an administration building, a four-station truck loading rack system, a truck scale, new electrical service, product pumps, and all necessary programming and automated controls. Special consideration was needed due to the site’s location in an active seismic zone.

Client
Yara North America
Service(s) Provided
Construction Management, Industrial Engineering
Location
Stockton, CA