WBCM provided complete engineering services for the upgrade of approximately 36 bents of the 1970s wharf at Berths 11 and 12 of the Dundalk Marine Terminal. Six-hundred feet of the existing slabs and deck beams were removed and new pre-stressed concrete piles and pile caps were installed. The updated platform was designed to support a 1,500 PSF live load to accommodate roll-on/roll-off and container vessel loading and unloading operations. Phasing was coordinated with the MPA to minimize operational impacts on the active terminal during construction.

Client
MDOT Maryland Port Administration (MPA)
Service(s) Provided
Marine Engineering, Structural Engineering, Civil Engineering, Permitting
Location
Baltimore, MD