WBCM provided engineering services for improvements to the facility’s water storage. The firm designed the demolition of an existing 150,000-gallon tank and the installation of a 250,000-gallon pedestal sphere replacement tank. Associated water distribution improvements included a 480-square-foot water booster pumping station with duplex 10-horsepower, single-stage vertical inline close-coupled pumps; 1,200 feet of 6inch ductile iron pipe (DIP) supply piping; 1,380 feet of 8-inch DIP distribution piping connecting with four hydrants; and 1,675 feet of new 8-inch Class 54 DIP discharge piping.

 

Client
US Department of Veterans Affairs
Service(s) Provided
Civil Engineering, Utility Engineering, Structural Engineering, Architecture, Permitting
Location
Saginaw, MI