WBCM coordinated Phase I and Phase II environmental assessments, provided oversight for the creation of a response action plan, and provided technical design for utility installation and final capping of the highly-contaminated former Kurt Iron & Metal facility site. The site was part of the Maryland Department of the Environment’s voluntary clean-up program. WBCM designed the site work that incorporated part of the area into the Mercedes-Benz Auto Terminal and used reclaimed asphalt bituminous paving as the site capping to preclude migration of on-site containments into the bay through storm water runoff and infiltration.

Client
MDOT Maryland Port Administration
Service(s) Provided
Marine Engineering, Environmental Engineering, Industrial Engineering, Civil Engineering, Survey, Permitting
Location
Baltimore, MD